EXPERIENCE is to a project what oil is to an engine - it ensures smooth running and prevents wear - especially under pressure.


Experience forms the basis for:


  • Strategically sound activities and decision-making
  • Identifying and evaluating opportunities / risks
  • Transfer of proven methods and development of new procedures


We are happy to share our experience and make it available for your projects - whether in an operational capacity or through coaching your project staff. We have summarised prior projects  and contributions  below.


Kapstadtring 5 -  Office space in Hamburg

Höhler & Partner for Hanseatische Investment GmbH

Commissioning coordination - centralised planning and control of commissioning, acceptance and handover processes.


  • 02/2022 until today

Consulting regarding project organisation with development and implementation of standards for project structuring, process and schedule planning as well as the associated controlling.


  • 01/19 until today

Production facilities Carl Zeiss Oberkochen

Innovatives Planen GmbH for Carl Zeiss, Oberkochen

Overall project management of the technical building equipment on the client and planner side across HOAI service phases 2-8.


  • 12/2016 to 05/2024

Pharmaceutical production plant – Dublin, Ireland

Daldrop & Huber GmbH for MSD International

Scheduling and controlling for the cleanrooms of a biochemical pharmaceutical production facility for the manufacture of a new cancer drug.


  • 06/2019 to12/2019

Alter Wall - art forum / office space in Hamburg

Ed. Züblin AG for ArtInvest Real Estate

Commissioning coordination - centralised planning and control of commissioning, acceptance and handover processes.


  • 10/2018 to 07/2019

Elbphilharmonie

Hochtief Infrastructure GmbH for the City of Hamburg, Adamanta

Commissioning coordination- Central planning and control of the processes for commissioning, acceptance and handover of the entire project including the luxury flats.


  • 08/2014 to 10/2018

5 Star Hotel - The Chedi Andermatt (CH)

Daldrop und Ing. Huber AG for Andermatt Swissalps AG (Kanton Uri, Switzerland)

Overall project management for work planning, execution and commissioning of the technical building equipment.


  • 01/2012 until 12/2014

2 x 800MW Westfalen hard coal-fired power station

Alstom Boiler Deutschland GmbH for RWE

Site Contract Manager as part of the turn-key contract for the realisation of two 800 MW steam generators in Hamm/Westphalia.


  • 11/2010 to 12/2011

Shopping Centre - “Hamburger Straße“

Bosch GmbH via projektimpulse GmbH for ECE

Project manager for plant planning, execution and commissioning of the low-voltage systems.


  • 04/2010 to10/2010

Solar cell production Blue Chip Energy, Austria

With ib vogt SE for Blue Chip Energy, Güssing (Burgenland, Austria)

Project manager for production line optimisation (ramp-up) / mediation between turnkey supplier of production lines and operator.


  • 01/2010 to 03/2010

University Medical Centre Hamburg-Eppendorf

Hochtief Construction GmbH (via Meyer Projektmanagement) for the University of Hamburg

Commissioning coordination - centralised planning and control of commissioning, acceptance and handover processes.


  • 12/2008 to 12/2009

Consultancy project management standards

With ib vogt SE - internal quality management

Analysis and documentation of standard processes in the determination of requirements, planning, awarding and realisation of solar cell production plants.


  • 12/2008 to 12/2009

Solar cell production "Line 5/6" Q-Cells

With ib vogt GmbH for Q-Cells (Wolfen/Thalheim)

Initially sub-project management for the control of planning and engineering services via HOAI LP 1-8 of cost group 300 (construction). Subsequently head of project management for the entire production complex consisting of production facility and technology centre. Management of the planning and engineering services in HOAI LP 8 (construction supervision, commissioning and ramp-up) across all cost groups.


  • 06/2006 to 11/2008

Reiner Lemoine Technology Centrem

With ib vogt GmbH for Q-Cells (Wolfen/Thalheim)

Head of project management for the planning and engineering services HOAI LP 1-8 of a technology centre with laboratory units and an area with production equipment.

Coordination of all trades (cost groups).


  • 03/2006 to 09/2008

Asklepios Clinic Hamburg - Barmbek

Imtech for ARGE Klinikum Barmbek

Planning coordination and project management for the realisation of the entire building services engineering (TGA).


  • 06/2003 to 10/2005

Spacepark Bremen

Imtech for STRABAG

Project management for factory planning, execution and commissioning of the ventilation and air-conditioning technology.


  • 07/2001 to 04/2003

Wafer-Fab 300 (semiconductor fabrication)

ROM Stuttgart for Wacker Chemie Burghausen

Project management at Prebasic - competition planning for the buildings as well as the building and plant technology.


  • 10/2000 to 06/2001

PluSS - Project management software

MGG (RAG Immobilien)         

Control of internal requirements and approval processes with implementation in programming


  • 04/2000 to 09/2000

Head office Douglas Holding, Hagen

Enning Architects     

Classic construction management HOAI LP 8.


  • 05/1999 to 03/2000